ClubSNAP will foot for the 2 - 3 tentages and maybe tables and chairs?

Please send me or Darren the bill for the items purcahse.

EastGear will loan out 2 units of Charger Devices 2X2 flash battery supply with Nikon Cable.

Let us know what else we can assist.


Cheers,

Simon
 

Summary So Far

A. Dates:

Weekend 1: 17 May / 18 May
Weekend 2: 24 May / 25 may
Weekend 3: 31 May / 1 Jun

B. Running time

Setup and take down: 7am / 9pm
Donation Drive: 8am to 8pm (12 hours)

C. Venue

map1.jpg


Location ''a'' : Merlion Park

map2.jpg


V = Visitor posing location
S = Shooting position
R = Resting station
P = Printing station

D. General Task

Photography and print for Merlion Park visitors.

E. Charge

minimum $10.00 worth of donation for every print made. 100% goes to Salvation Army.

F. Target

300 to 350 prints per weekend

or

S$10,000.00 in total donations collected

G. Logistics

O 1. 3 photo printers (2 running, 1 backup) SETTLED (details to be confirmed)
O 2. Ink cartridges (lasting 250 pc of prints per printer per weekend) SETTLED (details to be confirmed)
O 3. 4R photopapers 1200pc (400pc per weekend) SETTLED (details to be confirmed)
> 4. Plastic photograph holder 1200pc (optional)
O 5. 2 laptops (tentative) jopel / yanyewkay / Wai
O 6. 3 cameras (rotate usage) SETTLED (details to be confirmed)
X 7. 2 cable remote shutter control (1 in use, 1 backup) yanyewkay X 2 nikon cable release (tentative)
O 8. 2 external flash units (1 in use, 1 backup) SETTLED (details to be confirmed)
X 9. 2 tripods (1 in use, 1 backup) yqt 1 X big tripod
O 10. 4 to 6 memory cards yqt 2X 256 / yanyewkay 1X 1GB, 1x512, 1x4GB
> 11. 2 card readers (backup for wireless transfer) yanyewkay 1X card reader
> 12. 2 tentages (1 printing station, 1 resting station) (TBC with CS)
> 13. 2 tables (1 per tentage) (TBC with CS)
> 14. Chairs/benches (4 pax for printing station, 6-8 pax for resting station) (TBC with CS)
X 15. 2 ice boxes
> 16. 2 Lamps
> 17. 4 hand-torches yanyewkay X 1 big torch
> 18. 1 first-aid box
O 19. masking tapes (marking locations) yqt 2X rolls
> 20. 1 pack of large trashbags for water proofing in case of rain
X 21. 1 box of cable Ties
> 22. jerry cans (to act as weights for tentages)

O - items settled
X - items not settled
> - items not settled and to take note of

H. Electrical power requirements

O 1. Printer (Batteries lasting 12 hours per printer per day, or local power source)
SETTLED (details to be confirmed)
O 2. Laptop (Batteries lasting 12 hours per laptop per day, or local power source)
jopel / yanyewkay / Wai
O 3. Camera Batteries (2 fully charged, 1 charger per camera)
SETTLED (details to be confirmed) / yqt 3X batt & 1 X charger ( D200 )
O 4. Batteries for flash units, lamps and hand-torches
Eastgear: 2 units of Charger Devices 2 X 2 flash battery supply with Nikon Cable / yqt 1 X ext power pack for SB 800 yanyewkay 8X AA batts

I. Manpower (minimum on ground)

1. 1 Overall I/C ortega / yqt
2. 2 at shooting station (1 photographer, 1 guide)
3. 2 at printing station + 1 I/C
4. 2 for publicity
5. 1 Resting station I/C (look after personal belongings and materials)

J. Task specifics

Shooting station

1. Setup camera
2. Guide visitors to position
3. Photograph

Printing Station

1. Print photographs
2. Keep track of photograph owners putting money into donation boxes
3. Collect email addresses

Publicity

1. Moving around Merlion Park and vicinity to publicize with posters

K. Food and Drinks SETTLED (details to be confirmed)

1. cartons of mineral water (1 to 2 at any time)
2. cartons of packet drinks/isotonic drinks (1 to 2 at any time)
3. Catered/takeaway meals (Halal) for lunch and dinner for on-site volunteers

L. Publicity

1. 2 x A1 size posters (for display)
ortega
2. 2 x A3 size posters (for publicity personnels)
ortega
3. 1 poster stand with weights (optional)
4. 12 ''PhotoAid Volunteer'' tags and tag holders (for those on duty only)
ortega to design and print
yqt to buy the lan yard with holder


M. License/Contacts

yqt and ortega

What has been done

1. yqt contacted Salvation Army for tie-up
Done and yqt will sign the MOA with them before the start of the event
2. Hotspot contacted STB for use of Merlion Park
HotSpot getting the paper work done with yqt and ortega as the point of contact

What needs to be done

1. Provide Salvation Army with details of fund-raising event, latest by Monday 12 May
yqt to contact Salvation Army on Monday
2. Collect donations collection boxes from Salvation Army
yqt to collect every Friday and sent to them for accounting every Monday morning

N. Online

1. Setting up of photograph pool site
yanyewkay
2. Emailing password to photograph owners immediately at the end of each fund-raising day
yanyewkay
3. On line publicity

O. Parking at One Fullerton

(take note) 1. Contact One Fullerton manager for permission to park for free during fund-raising days

P. Miscellaneous

Briefing for volunteers

1. Participants are advised to each bring 1 water bottle (though drinks will be provided)
2. Participants are advised to wear caps
3. Participants are advised to apply sunblock
4. Participants are advised to arrive at venue 10min to 15min before start of shift to familiarize with the work
5. Participants are to be courteous to all visitors at all time.
6. Should any participants encounter difficulties when performing his work, he must report immediately to any one of the core group members on site.


Core Group Members' Attendance

17th May

DCnA - After 5pm (CRS event)
Yanzai - whole day
sjourn - morning setup, will be back 2nd shift
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - After 5.30pm
ortega - try for whole day or at least 1st shift

18th May

DCnA - After 5pm (Class)
Yanzai - whole day
sjourn - 2nd shift
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - TBC

24th May

DCnA - After 5pm (Work, try to take leave)
sjourn - not in Sg
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - After 5.30pm
Wai - Can reach there by 11pm
TupiGuy

25th May

DCnA - After 5pm (Class)
sjourn- not in SG
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - TBC
Wai - Can reach there by 11pm
TupiGuy

31st May

sjourn- morning setup, 1st shift
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - After 5.30pm
Wai - TBC
TupiGuy

1st Jun

sjourn - 2nd shift
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - TBC
ortega - try for whole day but at least 2nd shift
Wai - TBC
TupiGuy



Information to Salvation Army for Official Release

Dates:
17th & 18th May
24th & 25th May
31st May & 1st Jun

Timing: 8am to 8pm

Location: Merlion Park

How: Have your picture taken and printed on the spot for a min. donation of S$10.00

Sponsor List:

1) Nikon
2) Epson
3) Eastgear
4) CS


information received after 3pm 12th May may not be included in Salvation Army's official release
 

Maybe can help in 1st June, but other previous day cannot, got shoot, will try not to arrange shoot on 1st June.

1. I can help to shoot ppl or pose ppl, cannot do printing.
2. Supply extra memory card. (Why no wireless transfer?)
3. Will supply own camera and flash.

The only issue i have is too rush.

Regards
David Lim
97954615
 

maybe u should ask from salvation army if they got those casualty pics. Not sure those we get online can use anot.


I've checked with Salvation Army and because network there is down they can only communicate via land line and all internet/emails are down.
 

Maybe can help in 1st June, but other previous day cannot, got shoot, will try not to arrange shoot on 1st June.

1. I can help to shoot ppl or pose ppl, cannot do printing.
2. Supply extra memory card. (Why no wireless transfer?)
3. Will supply own camera and flash.

The only issue i have is too rush.

Regards
David Lim
97954615

Thanks David. Please PM ortega your details together with the date, time and how you can help out.

Thanks again
 

ok, we are getting the equipment on thursday

We should do a dry run on thursday night, i will be late as i have an office dinner, but will be there as soon as i can
 

ClubSNAP will foot for the 2 - 3 tentages and maybe tables and chairs?

Please send me or Darren the bill for the items purcahse.

EastGear will loan out 2 units of Charger Devices 2X2 flash battery supply with Nikon Cable.

Let us know what else we can assist.


Cheers,

Simon

Thanks Simon.

Glad to know that CS will be picking up the bill for the tentage as this is one of the big ticket item which we need to cover as well as their open offer of additional assistance.

It's also very nice of Eastgear to come in with their sponsorship, thanks to them as well.

Now what we need is more volunteers.
 

ok, we are getting the equipment on thursday

We should do a dry run on thursday night, i will be late as i have an office dinner, but will be there as soon as i can

Thursday night is OK with me but I have a whole day outdoor shoot so if it's early evening or dinner time than it may be a problem.

I'll be out of the office from 3pm and will not have email access till tomorrow mid noon so Sjourn, can help to arrange and keep track of this meeting?

Thanks Bro
 

Core Group Members' Attendance

17th May

DCnA - After 5pm (CRS event)
Yanzai - whole day
sjourn - morning setup, will be back 2nd shift
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - After 5.30pm
ortega - try for whole day or at least 1st shift
yqt - Set up and at least first shift ( Kid's birthday with my mon )

18th May

DCnA - After 5pm (Class)
Yanzai - whole day
sjourn - 2nd shift
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - TBC
yqt - whole day

24th May

DCnA - After 5pm (Work, try to take leave)
sjourn - not in Sg
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - After 5.30pm
Wai - Can reach there by 11pm
TupiGuy
yqt- Will try for whole day

25th May

DCnA - After 5pm (Class)
sjourn- not in SG
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - TBC
Wai - Can reach there by 11pm
TupiGuy
yqt- whole day

31st May

sjourn- morning setup, 1st shift
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - After 5.30pm
Wai - TBC
TupiGuy
yqt - TBC

1st Jun

sjourn - 2nd shift
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - TBC
ortega - try for whole day but at least 2nd shift
Wai - TBC
TupiGuy
yqt - at least 2nd shift
 

Core Group Members' Attendance

17th May

DCnA - After 5pm (CRS event)
Yanzai - whole day
sjourn - morning setup, will be back 2nd shift
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - After 5.30pm
ortega - setup and rush back home and come back for 2nd shift
yqt - Set up and at least first shift ( Kid's birthday with my mon )

18th May

DCnA - After 5pm (Class)
Yanzai - whole day
sjourn - 2nd shift
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - TBC
yqt - whole day
ortega - 2nd shift

24th May

DCnA - After 5pm (Work, try to take leave)
sjourn - not in Sg
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - After 5.30pm
Wai - Can reach there by 11pm
TupiGuy
yqt- Will try for whole day

25th May

DCnA - After 5pm (Class)
sjourn- not in SG
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - TBC
Wai - Can reach there by 11pm
TupiGuy
yqt- whole day

31st May

sjourn- morning setup, 1st shift
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - After 5.30pm
Wai - TBC
TupiGuy
yqt - TBC

1st Jun

sjourn - 2nd shift
Hotspots - Setup & 1st shift
Racoon - depends on Little HS schedule
zhangyb - TBC
ortega - TBC
Wai - TBC
TupiGuy
yqt - at least 2nd shift
 

Please Note The Finalised Details as follows:



Nikon Singapore will provide funds ($1100) for the following:
3 x Tentages
20 carton Mineral Water
Electricity bill for the 3 weekends from Fullerton Hotel

and also:
3 x D300 with lens
3x SB 800
9 x CF cards

Epson Singapore
Printers and all consumerables (Models to be confirmed)

EastGear and Clubsnap Admin will provide:
Funds for all the Lunch and dinner for all participants (more than $400)
15 AA rechargeable Batts and chargers
2 pcs 2 x 2 CD external Battery pack with Nikon cables.

I will provide the following:
3 x Drum Elect Cable
3 pcs x Multi plug 4 outlets
Storage facilities in Our Studio


All the above will collected by me and will be at the studio.

Address of the studio is as follows:

Mactech Industrial Building
2 Kallang Pudding Road, #04-14
Singapore 349307


We will meet there to test run the equipment. And load up into individual vehs.
 

Update on Merlion Park:

Received official approval from STB. Waiting for Fullerton to get back on electricity charges and car park for core group members.
 

Please Note The Finalised Details as follows:



Nikon Singapore will provide funds ($1100) for the following:
3 x Tentages
20 carton Mineral Water
Electricity bill for the 3 weekends from Fullerton Hotel

and also:
3 x D300
3x SB 800
9 x CF cards

Epson Singapore
Printers and all consumerables (Models to be confirmed)

EastGear and Clubsnap Admin will provide:
Funds for all the Lunch and dinner for all participants (more than $400)
15 AA rechargeable Batts and chargers
2 pcs 2 x 2 CD external Battery pack with Nikon cables.

I will provide the following:
3 x Drum Elect Cable
3 pcs x Multi plug 4 outlets
Storage facilities in Our Studio


All the above will collected by me and will be at the studio.

Address of the studio is as follows:

Mactech Industrial Building
2 Kallang Pudding Road, #04-14
Singapore 349307


We will meet there to test run the equipment. And load up into individual vehs.


Thanks chngpe and all sponsors for their kind assistance in our fund raising effort.

Chngpe, pls help us get in touch with jopel, wai and yyk once you have the confirm model of the printers as they are helping us with the IT part. Need to get this dry run and confirm bugs free before the actual. Thanks again.
 

Please Note The Finalised Details as follows:



Nikon Singapore will provide funds ($1100) for the following:
3 x Tentages
20 carton Mineral Water
Electricity bill for the 3 weekends from Fullerton Hotel

and also:
3 x D300
3x SB 800
9 x CF cards

Epson Singapore
Printers and all consumerables (Models to be confirmed)

EastGear and Clubsnap Admin will provide:
Funds for all the Lunch and dinner for all participants (more than $400)
15 AA rechargeable Batts and chargers
2 pcs 2 x 2 CD external Battery pack with Nikon cables.

I will provide the following:
3 x Drum Elect Cable
3 pcs x Multi plug 4 outlets
Storage facilities in Our Studio


All the above will collected by me and will be at the studio.

Address of the studio is as follows:

Mactech Industrial Building
2 Kallang Pudding Road, #04-14
Singapore 349307


We will meet there to test run the equipment. And load up into individual vehs.

PE, so the tables and chairs we collect from there and then send back there?
 

Update on Merlion Park:

Received official approval from STB. Waiting for Fullerton to get back on electricity charges and car park for core group members.

Thanks HotSpots.

Any mention on the rental fee or it is auto waive since it's from STPB?
 

Status
Not open for further replies.