Date of Notice : 29 May 2012
Period of Works : 1 Jun 2012 to 15 August 2012
Location : Marina Bay
Time and Date of closure to : See below
water traffic
Contact : Mr Jaykumar @ 92721597 - Explomo Technical
Services Pte Ltd
: Mr Vincent Chong @ 96951917 - Explomo Technical
Services Pte Ltd
: ME3 Toh Kok Chai @ 91459857 - NDP 12 Fireworks
Committee
1. Explomo Technical Services Pte Ltd will be doing the fireworks preparations for National Day Parade 2012 from 1 Jun 2012 near an area off Ducktours splash point.
2. From 8 Jun 2012 to 9 August 2012, a floating pontoon and anchors will be laid in Marina Bay as shown in the map here. The anchor positions for the floating pontoon will be marked by red marker buoys (with flags), with flashing red lights (flashing once every 5 secs).
3. The safety radius of 200m radius from the floating pontoon will be demarcated using line of floats. Red marker buoys (with flags) and no-entry buoys with flashing red lights will also be used to demarcate the cordon area.
FLOATING PONTOON AND ANCHORING COORDINATES
High level fireworks floating pontoon – 1°17'8.65"N, 103°51'22.34"E
Point 1 - 1°17'8.01"N, 103°51'23.00"E
Point 2 - 1°17'8.89"N, 103°51'23.00"E
Point 3 - 1°17'9.20"N, 103°51'21.88"E
Point 4 - 1°17'8.21"N, 103°51'21.71"E
4. When entering and leaving the Marina Bay, vessels are to keep clear of the floating pontoon and the no-entry buoys by skirting the perimeter of the Bay as indicated in the map here. Line of floats, red colour buoys and no-entry signs with flashing red lights mark the borders indicating the NO ENTRY ZONE.
RESTRICTED TIMING
5. Below are the timings fireworks will be loaded onboard the floating pontoon. All vessels are advised not to trespass into the no-entry zone. Safety boats will be present to enforce the 200m safety radius.
Event From (Date/ Time) To (Date/ Time)
Combined Rehearsal 1
20 Jun (0800 hrs)
23 Jun (2200 hrs)
Combined Rehearsal 2
27 Jun (0800 hrs)
30 Jun (2200 hrs)
Combined Rehearsal 3
4 Jul (0800 hrs)
7 Jul (2200 hrs)
Combined Rehearsal 4, NE show 1
11 Jul (0800 hrs)
14 Jul (2200 hrs)
Combined Rehearsal 5, NE show 2 18 Jul (0800 hrs) 21 Jul (2200 hrs)
Combined Rehearsal 6, NE show 3 25 Jul (0800 hrs) 28 Jul (2200 hrs)
NDP Preview 1 Aug (0800 hrs) 4 Aug (2300 hrs)
NDP 2012 5 Aug (0800 hrs) 9 Aug (2359 hrs)
6. Outside the above date and times, vessels are to keep clear of the floating pontoon and boundary marked by red marker buoys and no-entry buoys with flashing red lights.
CLOSURE OF MARINA BAY TO WATER TRAFFIC
7. Marina Bay will be closed to all vessels from 1845 hrs to 2015 hrs on the following days:
Event Date
Combined Rehearsal 1 23 Jun 2012
Combined Rehearsal 2 30 Jun 2012
Combined Rehearsal 3 7 Jul 2012
Combined Rehearsal 4, NE show 1 14 Jul 2012
Combined Rehearsal 5, NE show 2 21 Jul 2012
Combined Rehearsal 6, NE show 3 28 Jul 2012
NDP Preview 4 Aug 2012
8. For NDP 2012 on 9 Aug 2012, due to security requirements, Marina Bay will be closed from 1100 hrs to 2130 hrs.
9. 1 safety boat will be present at each closing limit (Esplanade Bridge and Benjamin Sheares Bridge). All vessels are to stay behind the safety boats and follow the instructions/ directions given by the safety boats crew.
REMOVAL
10. The floating pontoon/floats/buoys/anchors and all other structures will be removed from 10 Aug 2012 to 15 Aug 2012. The floating pontoon will be towed from Marina Bay to an area off Ducktours splash point for tear down.
11. All vessels are to give a wide berth to the towing operation.