National Day Parade Fire works Waterfront-Esplanade


Nikkornos

Senior Member
Oct 31, 2008
3,428
2
0
Singapore/Asia
Hello Guys,

The annual fire works begins and is a hot time for Club Snappers.
The LF guys are busy chatting on Whatsapp, so you don't see much here now.

Time: Saturday 14th July onwards, recurring every Saturday
Location: Waterfront-Esplanade area. Suggest to walk up to Benjamin Shears bridge

Equipment: Film/Digital anyformat with a wide/ medium tele

35mm film -> 70-210mm zoom, 28-70mm zoom
6X6 MF film -> 45-65mm wide, 150mm long
Large format -> a medium 135mm lens or the 90mm lens recommended

Shooting B&W or Color slides.
Setting --> F8 or F11 at 2 or 3 seconds.

You will have no time to compose. The Singapore fireworks is stingy and may last only a short while.

Meeting place to be announced. Meet early about 4pm, secure strategic position.
 

Last edited:
Since we are going early secure strategic position, a good place will be along esplanade on the left of the Outdoor Theater (if you face the sea) as we can shoot both the air and sea displays.

So this Sat 430pm?
 

Since we are going early secure strategic position, a good place will be along esplanade on the left of the Outdoor Theater (if you face the sea) as we can shoot both the air and sea displays.

So this Sat 430pm?

Fixed : Saturday 430pm
Location : meet inside the Durian performance area.

We can have a drink, chitchat, group photo, murk around, TCSS, etc.

Warning! The Apache will splash up a lot of water from the sea. Bring umbrella or Poncho.
 

Tips for Watching National Day Fireworks 2012

Don't miss the fireworks for Singapore NDP 2012! The fireworks will be launched from around the Float @ Marina Bay:

So practically any waterfront location at Marina Bay will be a good spot to watch the fireworks for NDP 2012.

IMPORTANT NOTE:
In the event of bad weather (or for health safety and other pertinent reasons), the NE Shows and Parades may be delayed, cut short or postponed according to the judgement of the organising committee. If this happens, the fireworks will be similarly affected.



How many fireworks displays are there?

Fireworks will be launched at the Preview Parade (30 July 2011) and National Day Parade (9 Aug 2011).

Fireworks will also be set off during the NE Shows (9, 16 & 23 July). But these are likely to be shorter, scaled-down bursts.

I photo-shot the fireworks during all 3 NE Shows and the Preview in 2008. And they were as good as the actual day's fireworks.

What's the fireworks schedule like for Singapore National Day 2011 (and all the rehearsals)?

Expect the fireworks to be launched near the end of the Show Segment, probably around 7.30pm - 8pm. Obviously, you'll need to turn up earlier to find yourself some space.


Where to watch them?

Here are the best spots to watch fireworks for Singapore NDP 2011.


Want to watch the fireworks in luxury?

Here are a few hotels and restaurants with great views of the fireworks...

Hotels with panoramic views of the fireworks:

Swissotel Stamford Hotel (highly recommended)

Ritz Carlton Millenia

Mandarin Oriental

Fullerton Hotel

Remember to book the harbour-facing rooms!
Restaurants with the views

Equinox Restaurant Singapore
(Level 70 of Swissotel the Stamford)

The Lighthouse (Fullerton Hotel)


What if I cannot make it for the dates listed above?

Go down to Marina Bay again for the Singapore Fireworks Celebrations. Each evening, the fireworks usually go on for 15 minutes.

(Fireworks Celebrations for 2012 to be confirmed.)
 

Date of Notice : 29 May 2012
Period of Works : 1 Jun 2012 to 15 August 2012
Location : Marina Bay
Time and Date of closure to : See below
water traffic

Contact : Mr Jaykumar @ 92721597 - Explomo Technical
Services Pte Ltd
: Mr Vincent Chong @ 96951917 - Explomo Technical
Services Pte Ltd
: ME3 Toh Kok Chai @ 91459857 - NDP 12 Fireworks
Committee

1. Explomo Technical Services Pte Ltd will be doing the fireworks preparations for National Day Parade 2012 from 1 Jun 2012 near an area off Ducktours splash point.

2. From 8 Jun 2012 to 9 August 2012, a floating pontoon and anchors will be laid in Marina Bay as shown in the map here. The anchor positions for the floating pontoon will be marked by red marker buoys (with flags), with flashing red lights (flashing once every 5 secs).

3. The safety radius of 200m radius from the floating pontoon will be demarcated using line of floats. Red marker buoys (with flags) and no-entry buoys with flashing red lights will also be used to demarcate the cordon area.

FLOATING PONTOON AND ANCHORING COORDINATES

High level fireworks floating pontoon – 1°17'8.65"N, 103°51'22.34"E

Point 1 - 1°17'8.01"N, 103°51'23.00"E

Point 2 - 1°17'8.89"N, 103°51'23.00"E

Point 3 - 1°17'9.20"N, 103°51'21.88"E

Point 4 - 1°17'8.21"N, 103°51'21.71"E


4. When entering and leaving the Marina Bay, vessels are to keep clear of the floating pontoon and the no-entry buoys by skirting the perimeter of the Bay as indicated in the map here. Line of floats, red colour buoys and no-entry signs with flashing red lights mark the borders indicating the NO ENTRY ZONE.

RESTRICTED TIMING

5. Below are the timings fireworks will be loaded onboard the floating pontoon. All vessels are advised not to trespass into the no-entry zone. Safety boats will be present to enforce the 200m safety radius.



Event From (Date/ Time) To (Date/ Time)

Combined Rehearsal 1
20 Jun (0800 hrs)
23 Jun (2200 hrs)
Combined Rehearsal 2


27 Jun (0800 hrs)
30 Jun (2200 hrs)

Combined Rehearsal 3

4 Jul (0800 hrs)
7 Jul (2200 hrs)

Combined Rehearsal 4, NE show 1
11 Jul (0800 hrs)
14 Jul (2200 hrs)

Combined Rehearsal 5, NE show 2 18 Jul (0800 hrs) 21 Jul (2200 hrs)
Combined Rehearsal 6, NE show 3 25 Jul (0800 hrs) 28 Jul (2200 hrs)
NDP Preview 1 Aug (0800 hrs) 4 Aug (2300 hrs)
NDP 2012 5 Aug (0800 hrs) 9 Aug (2359 hrs)


6. Outside the above date and times, vessels are to keep clear of the floating pontoon and boundary marked by red marker buoys and no-entry buoys with flashing red lights.

CLOSURE OF MARINA BAY TO WATER TRAFFIC

7. Marina Bay will be closed to all vessels from 1845 hrs to 2015 hrs on the following days:

Event Date
Combined Rehearsal 1 23 Jun 2012
Combined Rehearsal 2 30 Jun 2012
Combined Rehearsal 3 7 Jul 2012
Combined Rehearsal 4, NE show 1 14 Jul 2012
Combined Rehearsal 5, NE show 2 21 Jul 2012
Combined Rehearsal 6, NE show 3 28 Jul 2012
NDP Preview 4 Aug 2012

8. For NDP 2012 on 9 Aug 2012, due to security requirements, Marina Bay will be closed from 1100 hrs to 2130 hrs.

9. 1 safety boat will be present at each closing limit (Esplanade Bridge and Benjamin Sheares Bridge). All vessels are to stay behind the safety boats and follow the instructions/ directions given by the safety boats crew.

REMOVAL

10. The floating pontoon/floats/buoys/anchors and all other structures will be removed from 10 Aug 2012 to 15 Aug 2012. The floating pontoon will be towed from Marina Bay to an area off Ducktours splash point for tear down.

11. All vessels are to give a wide berth to the towing operation.
 

Last edited:
14 July 2012 : 4:30pm (can be there by 3pm)

1. Nikkornos (Toyo 45 105mm 4X5, Nikon DSLR)
2. zguy
3.
4.
5.
 

Bro, so from this wkend onwards? Got a few rolls of MF slides to shoot before I forget that they are in the fridge.
 

Date of Notice : 29 May 2012
Period of Works : 1 Jun 2012 to 15 August 2012
Location : Marina Bay
Time and Date of closure to : See below
water traffic

Contact : Mr Jaykumar @ 92721597 - Explomo Technical
Services Pte Ltd
: Mr Vincent Chong @ 96951917 - Explomo Technical
Services Pte Ltd
: ME3 Toh Kok Chai @ 91459857 - NDP 12 Fireworks
Committee

1. Explomo Technical Services Pte Ltd will be doing the fireworks preparations for National Day Parade 2012 from 1 Jun 2012 near an area off Ducktours splash point.

2. From 8 Jun 2012 to 9 August 2012, a floating pontoon and anchors will be laid in Marina Bay as shown in the map here. The anchor positions for the floating pontoon will be marked by red marker buoys (with flags), with flashing red lights (flashing once every 5 secs).

3. The safety radius of 200m radius from the floating pontoon will be demarcated using line of floats. Red marker buoys (with flags) and no-entry buoys with flashing red lights will also be used to demarcate the cordon area.

FLOATING PONTOON AND ANCHORING COORDINATES

High level fireworks floating pontoon – 1°17'8.65"N, 103°51'22.34"E

Point 1 - 1°17'8.01"N, 103°51'23.00"E

Point 2 - 1°17'8.89"N, 103°51'23.00"E

Point 3 - 1°17'9.20"N, 103°51'21.88"E

Point 4 - 1°17'8.21"N, 103°51'21.71"E


4. When entering and leaving the Marina Bay, vessels are to keep clear of the floating pontoon and the no-entry buoys by skirting the perimeter of the Bay as indicated in the map here. Line of floats, red colour buoys and no-entry signs with flashing red lights mark the borders indicating the NO ENTRY ZONE.

RESTRICTED TIMING

5. Below are the timings fireworks will be loaded onboard the floating pontoon. All vessels are advised not to trespass into the no-entry zone. Safety boats will be present to enforce the 200m safety radius.



Event From (Date/ Time) To (Date/ Time)

Combined Rehearsal 1
20 Jun (0800 hrs)
23 Jun (2200 hrs)
Combined Rehearsal 2


27 Jun (0800 hrs)
30 Jun (2200 hrs)

Combined Rehearsal 3

4 Jul (0800 hrs)
7 Jul (2200 hrs)

Combined Rehearsal 4, NE show 1
11 Jul (0800 hrs)
14 Jul (2200 hrs)

Combined Rehearsal 5, NE show 2 18 Jul (0800 hrs) 21 Jul (2200 hrs)
Combined Rehearsal 6, NE show 3 25 Jul (0800 hrs) 28 Jul (2200 hrs)
NDP Preview 1 Aug (0800 hrs) 4 Aug (2300 hrs)
NDP 2012 5 Aug (0800 hrs) 9 Aug (2359 hrs)


6. Outside the above date and times, vessels are to keep clear of the floating pontoon and boundary marked by red marker buoys and no-entry buoys with flashing red lights.

CLOSURE OF MARINA BAY TO WATER TRAFFIC

7. Marina Bay will be closed to all vessels from 1845 hrs to 2015 hrs on the following days:

Event Date
Combined Rehearsal 1 23 Jun 2012
Combined Rehearsal 2 30 Jun 2012
Combined Rehearsal 3 7 Jul 2012
Combined Rehearsal 4, NE show 1 14 Jul 2012
Combined Rehearsal 5, NE show 2 21 Jul 2012
Combined Rehearsal 6, NE show 3 28 Jul 2012
NDP Preview 4 Aug 2012

8. For NDP 2012 on 9 Aug 2012, due to security requirements, Marina Bay will be closed from 1100 hrs to 2130 hrs.

9. 1 safety boat will be present at each closing limit (Esplanade Bridge and Benjamin Sheares Bridge). All vessels are to stay behind the safety boats and follow the instructions/ directions given by the safety boats crew.

REMOVAL

10. The floating pontoon/floats/buoys/anchors and all other structures will be removed from 10 Aug 2012 to 15 Aug 2012. The floating pontoon will be towed from Marina Bay to an area off Ducktours splash point for tear down.

11. All vessels are to give a wide berth to the towing operation.


Hi Bro, very informative. :D