What is done so far ??????? Progress report please...


chngpe01

Moderator
Staff member
Hi Guys


Can I have an update of what is done so far. As time is drawing near, we have less than 3 weeks to pull this thru.

1. All sponsors invited
2. CS members list being updated and $ collected.
3. FujiFilm site recce done. Others site reccce scheduled for next Wed.
4. Dinner menu chosen - DM is to just go and pay $ and book
5. Written and waiting for Sponsor logo.
6. Nite program out.
7. Hotel for CBS booked and paid.

..
..
..
 

- organization of weekend walks all under control boss !!
- Reps from Malaysia, Indonesia, Vietnam and Philippines attendance confirmed boss !!
- Antique Cameras available confirmed !! (need u guys to confirm the display cabinets)
 

Last edited:
White T-shirt Artwork Done
Black T-shirt Artwork Done

printing should commence soon.

Artwork for A4 poster and stand up banner in progress, waiting for sponsor logo
main visual needs touch up, should not be a problem
 

Need the Size and Quantity of both Design confirm by End of week.

White T-shirt Artwork Done

Black T-shirt Artwork Done

printing should commence soon.

Artwork for A4 poster and stand up banner in progress, waiting for sponsor logo
main visual needs touch up, should not be a problem
 

1) White T-Shirt 400 pieces; Black T-Shirt 50 pieces. (Updated Details in the separate T-Shirt thread)
2) Sent out bio request from the speakers; awaiting reply
3)


Outstanding
1) Event Photographer - PE to hire - done, my assistant will be doing it for $200.
 

Last edited: